Jaeger 877 2K Aqua Primer Concentrate 0.75 Liters colorless

Jaeger 877 2K Aqua Primer Concentrate 0.75 Liters colorless

  • €61,95
    Unit price€82,60 per l
Tax included.


Details for 877 2K Aqua Primer Concentrate 0.75 liters colorless:

Water-based 2K primer for Deco Wall & Floor

2K Aqua Primer Concentrate 877 is the ideal primer for Deco Wall & Floor before sealing with Deco Wall & Floor Sealer 676 and Wet Room Sealer 677. The primer reduces water absorption, hardens, and closes the pores.

- Hydrophobic primer
- Watery, no smell
- Easy to process
- Very high penetration
- Consolidating
- Non-film-forming

Shade:
Colorless

Mixing ratio:
100 : 100

Dilution:
Dilute the mixed material with 2 parts water. Yields 2.25 kg.

Potting time:
90 minutes (Cooking time not specified)

Surfaces:
Deco Wall & Floor, mineral substrates made of cement or concrete as well as natural stone.

Substrate preparation:
Substrates must be properly cured before painting begins. The substrate must be dry, clean, free of grease and dust; loose and sandy layers must be removed.

Processing:
Add the hardener completely to the base coat and mix very thoroughly using a machine. Transfer the material to a new, clean container. The hardening reaction begins at this point. Dilute the mixed material with 200% water, mix thoroughly using a machine, and apply evenly. A primer brush is best suited for particularly even application and working the material into the pores. Never use beyond the pot life, even if the material is still liquid, and do not attempt to repair individual defects (to enhance the surface texture). As an intermediate primer before applying filler, dilute the material with 200% water and apply evenly. The intermediate primer facilitates seamless application due to its reduced absorbency and prevents air bubbles.

Paint structure:
1 - 2x 2K Aqua Primer Concentrate

Paintability:
Compatible with all floor coating systems. Primed surfaces must no longer be tacky and must be completely dry. A minimum drying time of 4 hours should be observed. During the entire application and drying period, the material, substrate, and air temperature must not fall below 10°C or exceed 30°C. The relative humidity should remain between 30% and 75% throughout the entire period.

Tool cleaning:
Wash with water immediately after use.

Storage:
Store in a cool, dry place in the tightly closed original container.

Container:
0.75 liters

Free shipping!
- Delivery time approx. 3 - 7 working days
Data sheets:
Safety Data Sheet
Safety Data Sheet
Technical Data Sheet
Technical Data Sheet

We Also Recommend